Saturday afternoon checking of the house/condo found a crane on site and at least two-thirds of the roof trusses in place.
I know it's a little early, but now I can imagine living here.
On the left side of the picture we can see the overhang for the front porch.
The four season room on the back of the house has a cathedral ceiling. This was a last minute change from the original plans, and I'm hoping we will be able to heat the room to a comfortable temperature in the winter.
Peeking in the basement window from the back of the house.
Still in the back of the house on the other side of the four season room, Jay is checking out the shade in the area that will eventually be our deck and his second kitchen.
On the mostly south side of the garage looking up at more trusses.
Still the mostly south side of the house behind the garage. That's our bedroom window, but today we're admiring the trusses up above it.
One last look as we drive off to try and figure out how we are going to get home through all the road construction. This picture was taken on H Avenue.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment