Thursday, August 07, 2014
Almost Ready For Insulation
Inspections have been completed on the electrical, plumbing, and heating. Windows have been covered with plastic (we don't know why), and the insulation has been delivered.
The siding is finished with the completion of the far left office room. The garage front, on the right, will be brick.
Couldn't resist taking a picture of one of the outdoor faucets.
Most exciting to me, the lumber for the deck has been delivered. I know insulation is more important than a deck, but the deck is more fun to watch. The insulation is only exciting because once it's installed the drywall can go up. Drywall is going to be totally thrilling. I may post a picture of every sheet of it!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment