The siding resides in the garage since last week. Mostly in boxes, but these pieces show the color, Clay Brown.

We thought the siding would be next, but the electrician, the plumber, and the heating and cooling people all showed up yesterday with no sign of the siding people.


Yesterday evening Parker Scott, granddaughter Kim, and daughter Heather (left to right) came over from Pennfield (Battle Creek) to see the progress. The workers were gone so I took some pictures.


Heather thought it was amusing that I took a picture of duct work. I ignored her.


The boxes for the electrical work are mostly in place.


And there is plumbing.


The master bath shower is in place.


The second main floor shower is in place.


The garage is the storage area for all types of miscellaneous pieces. Grab what you need, I guess.